WCMRC Spill Response Facility
Do You Have A Project We Can Help With?
WCMRC Nanaimo Response Base Facility
The Project consists of the construction of a new two storey steel framed office and warehouse building located on the property of the Nanaimo Port Authority at the Nanaimo Assembly Wharves in Nanaimo, BC. The 1,710m² building area consists of a two storey office component complete with an elevator, curtain wall glazing, and programing that includes meeting rooms, office space, as well as staff changerooms and amenity spaces. The double height volume shop includes a small, steel framed mezzanine structure, exterior covered work area, recessed loading dock and is accessible with overhead roll up doors on two building faces. The building is clad with a variety of cladding materials including insulated metal sandwich panels, fibre cement and engineered wood cladding products, as well as some metal composite panel accents. This includes associated structural, electrical, mechanical, fire suppression, civil site works, fencing and road works.
PROJECT KEY FEATURES
- Steel Erection and Suspended Concrete Floor
- Architectural Aluminum Paneling
- Emergency Electrical System
- Vehicle Exhausting Systems and Fire Suppression
- Custom Signage and Millwork
- Site Furnishings and Elevator Installation
- Asphalt and Concrete Works
Project Details
FINISHED
August, 2022
LOCATION
Nanaimo
CLIENT
Western Canada Marine Response Corporation
PROJECT VALUE
$11.2m