Commercial mall upgrades in Fort St. John.

VALUE:$2,500,000
LOCATION: Fort St. John, BC
START DATE: September, 2013   END DATE: November, 2014

OVERVIEW:
Phase 1 work included:
Field Engineering and Quality Control; Topsoil Placement; Seeding; General Grading and Earthworks; Subgrade Preparation; Granular Base Course; Trenching, Bedding and Backfill; Hot – Mix Asphalt Concrete; Sewers; Manholes and Catch basins; Water Distribution; Sewer and Water Services; Normal Density Concrete.
Phase 2 work included:
Independent Inspection and Testing (Quality Control); Removal of Existing Surfaces; Abandonment of Existing Storm Utilities; Excavation; Subgrade Preparation; Concrete Islands; Granular Base Course; Asphalt Concrete Pavement; Asphalt Sealing & Repairs, Storm Drainage Utilities, Stormceptor; Stormwater Storage System; Manholes and Catch basins.

PROJECT KEY FEATURES:
■ Sewer Pump Station Work
♦ Storm Sewer
♦ Water Works
■ Traffic Management
♦ Road Works